Longpoint Road Interchange Improvements

I-526 Lowcountry Corridor EAST planning studies have identified the need for operational improvements at the Long Point Interchange on I-526 at mile point 28.  SCDOT will develop an interchange improvement project to improve operations at this interchange which includes both heavy volumes of commuter traffic and large trucks using this interchange to access the Wando Welch Port terminal.  The potential improvement alternatives may include improvements at the Long Point Road Interchange and/or a new interchange alternative.


Request for Proposals

 

 

 

 

Request for Qualifications

Notice to Proposers

Technical Provisions Attachments

  1. R1_Technical Provision Attachments Index  (Posted 9/29/25)

Traffic

  1. TPA 650-1 Conceptual LPR Signing Plan (Posted 9/19/25)

Third Party

  1. TPA 111-1 Town of Mount Pleasant Municipal Agreement (Posted 9/19/25)
  2. TPA 111-2 SCPA MOA (Posted 9/19/25) 
  3. TPA 112-1 SCPA Special Provisions (Posted 9/19/25)

Project Information Package

Construction

  1. Complete List of SOV Items (Posted 9/19/25)

Geotechnical

  1. Geotechnical Baseline Report (Posted 9/19/25)

Environmental

  1. Long Point Rd Interchange Permit Application (Posted 9/19/25)

Hydro

  1.  Pipe Inspection Info (Posted 9/19/25)
  2. Preliminary Hydro Report (Posted  9/19/25)
  3. LPR Conceptual Plans Pipe Inspection Label  (Posted  9/19/25)

Structures

  1.  R1_Conceptual Bridge Plans (Posted 9/19/25)
  2. SI&A_LongPoint (Posted 9/19/25)
  3. Existing Bridge Information (Posted 9/19/25)

Traffic

  1. Conceptual Signing Plan DGNs (Posted 9/19/25)
  2. SignCAD Sign Layouts  (Posted 9/19/25) 

Utilities

  1. Utility Information for RFP  (Posted 9/23/25)

Statement of Qualification Distribution Meeting

A Long Point Road Interchange Improvement Statement of Qualification Distribution Meeting will be held on July 15, 2025 at 11:30 am via Microsoft Teams.

The following is the Microsoft Teams Meeting login information:

Microsoft Teams Need help?

Join the meeting now

Meeting ID: 285 047 527 144 1

Passcode: 6aF3WA66

Long Point Road SOQ Distribution Meeting Agenda

 

Statement of Qualification Evaluation Meeting

A Long Point Road Interchange Improvement Project Statement of Qualification Evaluation Meeting will be held on August 8, 2025 at 8:30 am via Microsoft Teams.

The following is the Microsoft Teams Meeting login information:

Microsoft Teams Need help?

Join the meeting now

Meeting ID: 290 156 416 953 3

Passcode: aL7VX6v9

Dial in by phone

+1 803-529-1369,,209140753# United States, Columbia

Find a local number

Phone conference ID: 209 140 753#

Long Point Road SOQ Evaluation Meeting Agenda