Carolina Crossroads:
I-20/26/126 Corridor Improvement Project

Phase 1 - Colonial Life Boulevard at I-126 Interchange

The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing improvements to the interstate corridor of I-20/26/126, including the system interchanges at I-20/I-26 and I-26/I-126 in Lexington and Richland Counties. These improvements are proposed to increase mobility and enhance traffic operations by reducing existing traffic congestion within the I-20/26/126 corridor, while accommodating future traffic needs. The corridor's approximately 14 miles of mainline interstate include I-26 from Exit 101 - Broad River Road (US 176) to east of the Saluda River, I-20 from the west of the Saluda River to west of the Broad River, and I-126 from I-26 to east of the interchange with Colonial Life Boulevard. The project website is at www.SCDOTcarolinacrossroads.com.

In general, Phase 1 consists of reconstruction of the Colonial Life Boulevard at I-126 interchange and a portion of the I-126 operational improvements.

Request for Proposals

Notice to Potential Proposers

Attachment B - Supplemental Project Design Criteria

Pavement

  1. Phase 1 Pavement Design Traffic (07/06/20)

Railroad

  1. CSXT Special Provisions (07/06/20)


Statement of Qualifications Evaluation Team Meetings

A Carolina Crossroads Phase 1 - Colonial Life Blvd. SOQ Distribution Meeting will be held on May 15, 2020 at 9:00 am.

The following is the WebEx login information:

Friday, May 15, 2020 9:00 am
Meeting number: 476 048 172
Password: v8xJfYeDj26
https://scdot.webex.com/scdot/j.php?MTID=ma003c9fbe42094e3351db5e32a917d11

Join by phone
+1-415-655-0001 US Toll
Access code: 476 048 172

Evaluation Committee Meeting


Notice to Parties Interested in Providing Design Build Services

Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.