CAROLINA CROSSROADS: I-20/26/126 CORRIDOR IMPROVEMENT PROJECT

Phase 3D—I-26/126 System Interchange Design-Build Project

The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing improvements to the interstate corridor of I-20/26/126, including the system interchanges at I-20/I-26 and I-26/I-126 in Lexington and Richland Counties. These improvements are proposed to increase mobility and enhance traffic operations by reducing existing traffic congestion within the I-20/26/126 corridor, while accommodating future traffic needs. The corridor's approximately 14 miles of mainline interstate include I-26 from Exit 101 - Broad River Road (US 176) to east of the Saluda River, I-20 from the west of the Saluda River to west of the Broad River, and I-126 from I-26 to east of the interchange with Colonial Life Boulevard. The project website is at SCDOT Carolina Crossroads.

Phase 3D consists of the reconstruction of the I-26 at I-126 system interchange including the replacement of bridges within the interchange and the I-26 mainline bridge over the Saluda River. This improvement is in preparation for the I-20 at I-26 system interchange improvement to be completed by later project phases.

Request for Proposals

Request for Qualifications

Technical Provisions Attachments

TP TPA Number Revision Number Description Latest Revision Date
General 100-1 R0 Standards 11/09/2026
General 100-2 R0 CCR Project Survey Control Summary 11/09/2026
General 100-3 R0 Road Design Reference Material for Consultant Prepared Plans for CCR Phase 3D 11/09/2026
General 100-4 R0 Minimum List of SOV Items 11/09/2026
Project Management 110-1 R0 Quality Assurance Program 11/09/2026
Project Management 110-2 R0 Structural and Utility Shop Drawing Review Process 11/09/2026
Project Management 110-3 R0 Traffic Shop Plan Review Process 11/09/2026
Project Management 110-4 R0 SCDOT's Comment Matrix Spreadsheet 11/09/2026
Project Management 110-5 R0 IQF Environmental Guidance Documents 11/09/2026
Third Party 111-1 R0 City of Columbia Municipal Agreement 11/09/2026
Third Party 111-2 R0 City of West Columbia Municipal Agreement 11/09/2026
Third Party 111-3 R0 CSX Railroad Agreement 11/09/2026
Utility 140-1 through 4 R0 TPA140 Utility Information for RFP 11/09/2026
Environmental 160-1 R0 Carolina Crossroads FEIS 11/09/2026
Environmental 160-2 R0 Carolina Crossroads FEIS ROD & Summary 11/09/2026
Environmental 160-3 R0 Carolina Crossroads FEIS Appendices 11/09/2026
Environmental 160-4 R0 Phase 3C Environmental Commitments 11/09/2026
Environmental 160-5 R0 CCR Individual Permit Approval 11/09/2026
Environmental 160-6 R0 401 Water Quality Certification 11/09/2026
Environmental 160-7 R0 404 Permit Conditions / 401 Water Quality Certification Permit Conditions 11/09/2026
Environmental 160-8 R0 USACE Permit Modifications 11/09/2026
Environmental 160-9 R0 Impact and Mitigation Tracking Spreadsheet 11/09/2026
Environmental 160-10 R0 CCR Project Study Area 11/09/2026
Environmental 160-11 R0 Environmental Compliance Plan Template 11/09/2026
Environmental 160-12 R0 Scenic Easement for Saluda River 11/09/2026
Environmental 160-13 R0 NEPA Re-Evaluations 11/09/2026
Environmental 160-14 R0 2019 CCR JD Revision & Approval 11/09/2026
Environmental 160-15 R0 CCR Phase 3D TNM Files 11/09/2026
Environmental 160-16 R0 Permit Plan CAD 11/09/2026
Environmental 160-17 R0 CCR Bat Survey Report 11/09/2026
Environmental 160-18 R0 Clearing Moratorium Locations 11/09/2026
Environmental 160-19 R0 CCR Phase 3D Bridge Hazardous Materials Reports 11/09/2026
Environmental 160-20 R0 P043323 CCR Lighting PCE final 11/09/2026
Roadway 200-1 R0 CCR Phase 3D Basic Configuration 11/09/2026
Roadway 200-2 R0 Fence Locations 11/09/2026
Roadway 200-3 R0 CCR Phase 3D Additional Information for Basic Configuration 11/09/2026
Pavement 400-1 R0 Pavement Design Traffic 11/09/2026
Signing 650-1 R0 CCR Phase 3D Conceptual Signing Plan 11/09/2026
Signing 650-2 R0 Overhead Sign Lighting Spec 11/09/2026
Traffic Signals 675-1 R0 Traffic Signals Plan Preparation Requirements 11/09/2026
Traffic Operations 680-1 R0 I-20_I-26_I-126 Systems IMR Re-evaluation Approval Letter 11/09/2026
Traffic Operations 680-2 R0 I-20_I-26_I-126 Systems IMR Re-evaluation 11/09/2026
Traffic Operations 680-3 R0 HSM_Predictive Crash Analysis Methods 11/09/2026
Traffic Operations 680-4 R0 Systems IMR Re-evaluation_Transmodeler Files 11/09/2026
Traffic Operations 680-5 R0 TransModeler Parameters and Settings 11/09/2026
Traffic Operations 680-6 R0 Synchro 11 Defaults 11/09/2026
Traffic Operations 680-7 R0 MSA Ph1 and Ph2 Traffic Technical Report 11/09/2026
Traffic Operations 680-8 R0 HSM Analysis Requirements 11/09/2026
Structures 700-1 R0 Rigid Barrier Adjacent to Wall 11/09/2026
Structures 700-2 R0 Revisions to SCDOT Seismic Design Specifications for Highway Bridges 11/09/2026
Structures 700-3 R0 Noise Barrier Wall Design Criteria 11/09/2026
Structures 700-4 R0 Design Criteria for Box Culverts and Box Culvert Extensions 11/09/2026
Structures 700-5 R0 Roadway Structure Plan Preparation Requirements 11/09/2026
Structures 700-6 R0 Existing Bridge Data 11/09/2026
Structures 700-7 R0 Bridge Hanger Attachment 11/09/2026
Structures 700-8 R0 Complex Bridge Peer Review Requirements 11/09/2026
Structures 700-9 R0 Post Tensioning Special Provision 11/09/2026
Structures 700-10 R0 Interior Bent Cap Overhang Details 11/09/2026
Structures 700-11 R0 Bridge Rehab Requirements 11/09/2026
Structures 700-12 R0 SCDOT ITS Standard Drawings 11/09/2026
Geotechnical 711-1 R0 Geotechnical Subsurface Data Report 11/09/2026
Geotechnical 711-2 R0 3-Point Acceleration Design Response Spectrum 11/09/2026
Geotechnical 711-3 R0 Vibration Monitoring 11/09/2026
Geotechnical 711-4 R0 Field Testing Data 11/09/2026
Geotechnical 711-5 R0 Acceptable Polymer Slurry Systems 11/09/2026
Hydrology 714-1 R0 Toe Ditch Detail 11/09/2026
Hydrology 714-2 R0 SWPPP Checklist 11/09/2026
Hydrology 714-3 R0 Abutment and Pier Setbacks 11/09/2026
Hydrology 714-4 R0 CCR Phase 3D Video Pipe Inspection Summary 11/09/2026
Hydrology 714-5 R0 SC UH Method Resources 11/09/2026
Hydrology 714-6 R0 SCDOT-Spreadsheet SC-Synthetic-UH-Method 30-July-2020 11/09/2026
Right of Way 809-1 R0 Schematic Right of Way Plans 11/09/2026
Right of Way 809-2 R0 CCR ROW Label 11/09/2026
Sustainability 900-1 R0 CCR Sustainability Action Plan 11/09/2026
Sustainability 900-2 R0 CCR Recycled Form Example 8-11-20 11/09/2026
Sustainability 900-3 R0 CCR Recycled Materials Summary Example 8-11-20 11/09/2026

Project Information Package

Discipline PIP Number Revision Number Description Latest Revision Date
General 100-1 R0 CCR Phase 3D Interim Conditions 11/09/2026
General 100-2 R0 2009 Base Mapping 11/09/2026
General 100-3 R0 2009 CCR Target Information 11/09/2026
General 100-4 R0 2009 Aerial Images 11/09/2026
General 100-5 R0 38169 2009 dat tin 11/09/2026
General 100-6 R0 Phase 3 Proposer Data 11/09/2026
General 100-7 R0 Complete List of SOV Items 11/09/2026
Public Involvement 130-1 R0 CCR Public Engagement and Construction Outreach Plan 11/09/2026
Utility 140-1 through 9 R0 PIP140 Utility Information for RFP 11/09/2026
Railroad 150-1 R0 CSX ValMap 04145 11/09/2026
Railroad 150-2 R0 CCR Phase 3C CSX Construction Agreement 11/09/2026
Railroad 150-3 R0 CCR Phase 1 CSX Construction Agreement 11/09/2026
Environmental 160-1 R0 Stream Wetland CADD 11/09/2026
Environmental 160-2 R0 2016 CCR JD Approval (with mapping) 11/09/2026
Environmental 160-3 R0 Phase I ESA's for CCR Phase 3D 11/09/2026
Environmental 160-4 R0 Bat Survey Report - Appendices 11/09/2026
Roadway 200-1 R0 CCR Phase 3D Additional Information for Basic Configuration-CAD 11/09/2026
Roadway 200-2 R0 Draft Design Exceptions 11/09/2026
Pavement 400-1 R0 SCDOT CCR GPR Report S&ME 11/09/2026
Pavement 400-2 R0 GPR Data 11/09/2026
Pavement 400-3 R0 GPR Core Locations 11/09/2026
Pavement 400-4 R0 CCR Phase 3 Shoulder Rideability 11/09/2026
Pavement Marking 625-1 R0 Example Pavement Marking Plans 11/09/2026
Signing 650-1 R0 Existing Overhead Signs 11/09/2026
Signing 650-2 R0 Conceptual Signing Phase 3D CADD 11/09/2026
Signing 650-3 R0 Sign Barcode Form 11/09/2026
Signing 650-4 R0 Example Signing Plans 11/09/2026
Signing 650-5 R0 Phase 1 Signing Shop Drawings 11/09/2026
Traffic Operations 680-1 R0 I-20-26-126 IMR Approval Memorandum.pdf 11/09/2026
Traffic Operations 680-2 R0 Carolina Crossroads Appendix E Interchange Modification.pdf 11/09/2026
Traffic Operations 680-3 R0 Crash Analysis 11/09/2026
Lighting 690-1 R0 Conceptual Lighting Plan for Phase 3D 11/09/2026
Lighting 690-2 R0 Conceptual Lighting Plan for I-126 Lighting Extension 11/09/2026
Geotechnical 711-1 R0 Geotechnical Base Line Report 11/09/2026
Geotechnical 711-2 R0 Field Testing Data 11/09/2026
Hydrology 714-1 R0 SCDES Permitting Time Chart 11/09/2026
Hydrology 714-2 R0 CCR Phase 3D Stormwater Report and Appendices 11/09/2026
Hydrology 714-3 R0 Phase 3D Hydraulic Information 11/09/2026
Hydrology 714-4 R0 HEC-RAS 11/09/2026
Hydrology 714-5 R0 FEMA Data 11/09/2026
Hydrology 714-6 R0 2015 USGS HWM Saluda 07 23 20 11/09/2026
Hydrology 714-7 R0 CCR Phase 3D Video Pipe Inspections_I-26_I-126 11/09/2026
Hydrology 714-8 R0 CCR Phase 1 Drainage Files 11/09/2026
Hydrology 714-9 R1 CCR Phase 3A Drainage Files 11/09/2026
Right of Way 809-1 R0 P027662 ROW Plans 11/09/2026
Right of Way 809-2 R0 Right of Way CAD File 11/09/2026
Right of Way 809-3 R0 Right of Way Data Sheets 11/09/2026
Sustainability 900-1 R0 Construction Management Plan Guidance 11/09/2026

Historical Project Information

  • CCR QAP - Phase 3D (Moved to TPA 110-1)
  • Carolina Crossroads FEIS (Moved to TPA 160-1)
  • Carolina Crossroads FEIS Appendices (Moved to TPA 160-3)
  • Carolina Crossroads FEIS ROD and Summary (Moved to TPA 160-2)
  • NEPA Re-Evaluations (Moved to TPA 160-13)
  • CCR Individual Permit Approval (Moved to TPA 160-5)
  • USACE Permit Modifications (Moved to TPA 160-8)
  • 401 Water Quality Certification (Moved to TPA 160-6)
  • 2016 CCR JD Approval (with mapping) (Moved to PIP 160-2)
  • 2019 CCR JD Revision and Approval (Moved to TPA 160-14)
  • CCR Geotechnical Baseline Report (Moved to PIP 711-1)
  • Field Testing Data - All Phases (Moved to PIP 711-2 and TPA 711-4)
  • Phase I ESAs (Moved to PIP 160-3)
  • CCR Phase 3D Bridge Hazardous Material Reports (Moved to TPA 160-19)
  • Schematic Design Files (Removed)
  • P027662 ROW Plans (Moved to PIP 809-1)
  • Draft Phase3D_Basic Configuration (Moved to TPA 200-1)
  • SI&A_Phase 3D (Moved to TPA 700-6)
  • 2009 Aerial Images (Moved to PIP 100-4)
  • 2009 Base Mapping (Moved to PIP 100-2)
  • 2009 CCR Target Information (Moved to PIP 100-3)
  • 38169 2009 dat tin (Moved to PIP 100-5)
  • Frontage Roads (Removed)
  • I26 Main Rockland Rd (Removed)
  • Surveys Routes S-273 Rockland Road_Woodlands Dr (Removed)
  • I-20 I-26 I-126 Systems IMR Re-evaluation Approval Letter (Moved to TPA 680-1)
  • I-20 I-26 I-126 Systems IMR Re-evaluation (Moved to TPA 680-2)
  • Systems IMR Re-evaluation Transmodeler Files (Moved to TPA 680-4)
  • Utility Information for RFP (Moved to TPA140 Utility Information for RFP and PIP140 Utility Information for RFP)

CCR Phase 3D - Statement of Qualification Evaluation Meeting

8:30AM

October 27-29, 2026

317 Zimalcrest Drive, Columbia, SC 29210

Microsoft Teams meeting

Join: https://teams.microsoft.com/meet/2540167362647873?p=c3CbHlg0xiGpaodClF

Meeting ID: 254 016 736 264 787 3

Passcode: uC2wC7a2

Need help? | System reference

Dial in by phone

+1 803-529-1369,,107639079# United States, Columbia

Find a local number

Phone conference ID: 107 639 079#

For organizers: Meeting options | Reset dial-in PIN

Statement of Qualifications Distribution Meeting

September 25, 2026 9:00 AM

Microsoft Teams meeting

Join: https://teams.microsoft.com/meet/288850648297615?p=JRZsSEbf6mKERnzxmF

Meeting ID: 288 850 648 297 615

Passcode: G7um6Xe9

Need help? | System reference

Dial in by phone

+1 803-529-1369,,211527423# United States, Columbia

Find a local number

Phone conference ID: 211 527 423#

For organizers: Meeting options | Reset dial-in PIN