I-77 Exit 26 New Interchange & Connecting Roads

The South Carolina Department of Transportation (SCDOT) proposes to construct a new Interchange on I-77 to serve the future Scout Motors Manufacturing facility and provide access to promote future economic development in Blythewood, SC. The project includes a connector road from the proposed Exit 26 to US 21. Portions of US 21 are proposed be relocated to create a grade separated crossing for a new Norfolk Southern railroad spur line that will serve the Scout facility. A new railroad bridge over I-77 is proposed to provide rail access to the west side of I-77. In addition, widening of northbound I-77 from south of the proposed interchange to Blythewood Road as well as improvements along Community Road are planned.

Scout Development Project Website

SCDOT Project Website

Request for Qualifications

Attachment B – Supplemental Project Design Criteria

Project Information Package

Traffic

  1. 1. Draft P042443_I77 at Exit 26 IJR (01/12/24)
  2. P042443_IJRAnalysisFiles (03/01/24)
  3. I-77 Scout Interchange Sign Layouts (03/15/24)
  4. I-77_Scout_Interchange_Conceptual_Signing_Plan_Microstation (04/23/24)

Utilities

  1. Utility Information for RFP (01/12/24)

Geotechnical

  1. P042443 Geotechnical Baseline Reports (02/09/24)

Statement of Qualification Distribution Meeting

An I-77 Exit 26 New Interchange &Connecting Road Design-Build Project Statement of Qualification Distribution Meeting will be held on January 3, 2024 at 2:30 pm via Microsoft Teams.

The following is the WebEx login information:

Microsoft Teams Meeting
Join on your computer or mobile app
Click here to Join the Meeting

Meeting ID: 254 594 962 419
Passcode: rB6dHf

Or call in (audio only)
+1 803-529-1369,,420682439# United States, Columbia
Phone Conference ID: 420 682 439#

Find a local number | Reset PIN| Learn More |Meeting options

I-77 New Exit 26 Interchange and Connecting Roads SOQ Distribution Meeting Agenda

Statement of Qualification Evaluation Meeting

An I-77 New Exit 26 Interchange and Connecting Roads Design-Build Project Statement of Qualification Evaluation Meeting will be held on February 1st at 8:55 am via Microsoft Teams.

The following is the WebEx login information:

Microsoft Teams Meeting
Join on your computer or mobile app
Click here to Join the Meeting

Meeting ID: 274 320 636 362
Passcode: kgKYoZ

Or call in (audio only)
+1 803-529-1369,,288160975# United States, Columbia
Phone Conference ID: 288 160 975#

Find a local number | Reset PIN| Learn More |Meeting options

I-77 New Exit 26 Interchange and Connecting Roads SOQ Evaluation Meeting Agenda