SCDOT proposes to repair and/or replace two load restricted secondary bridges in Horry County. The project will include replacing the existing S-31 bridge and repairing the S-154 bridge and also include any associated roadway work.
![Google Maps icon](/img/googleMaps.jpg)
Bridge links below display the location in Google Maps.
Horry County
Request for Proposals
- Request for Proposals for Industry Review (Posted 7/22/24)
Request for Qualifications
- Bridge Package 18 Short-Listed Design Build Teams (Posted 7/22/24)
- SOQ Submitters List (Posted 6/24/24)
- Request for Qualifications - Addendum 1 (Posted 5/31/24)
- Notice to Proposers - Addendum 1 (Posted 5/31/24)
- Non-Confidential Questions and Answers (Posted 5/31/24)
- Request for Qualifications (Posted 5/22/24)
Notice to Proposers
- Early Coordination Advertisement (Posted 4/17/24)
- Early Coordination Meeting Presentation (Posted 4/26/24)
Attachment B - Supplemental Project Design Criteria
Environmental
- S-154 over Murrells Inlet Ck PCE final (5/22/24)
- S-31 over Tod Swamp PCE final (5/22/24)
- Cypress Avenue SCDOT Signed Critical Line Plat Final (5/22/24)
- S-154 Murrells Inlet Creek_Delineated Waters_12262023_verified (5/22/24)
- USCG Completion Report 4599 (5/22/24)
Geotechnical
- S-31 Geotechnical Subsurface Data Report (5/22/24)
- Field Testing Data Files (5/22/24)
Hazardous Materials
- Asbestos and Lead-Based Paint Reports (5/22/24)
Hydro
- Toe-Ditch-Detail (5/22/24)
- SWPPP-Checklist (5/22/24)
Roadway
- Package 18_Roadway Typical Sections (5/22/24)
- Package 18 Traffic Projections (5/23/24)
- Non-Mow Strip Guardrail Details (5/22/24)
- S-154_Design_Exception (7/22/24)
Survey
- Package 18 Surveys (5/22/24)
Construction
- Minimum SOV Items (7/22/24)
Traffic
- Package 18 Detour Routes (7/22/24)
Project Information Package
Environmental
Geotechnical
- S-31 Geotechnical Baseline Report (5/22/24)
Hydrology
- Memos and Models (5/22/24)
Roadway
- Package 18_Conceptual Roadway Plans (5/22/24)
- Package 18_Conceptual Roadway Microstation Files (5/22/24)
Structures
- S-31 Tod Swamp Conceptual Bridge Plans (5/22/24)
- SI&A_Package18 (5/22/24)
- Conceptual Bridge Plan DGN Files (5/22/24)
Construction
- Complete-List-of-SOV-Items (7/22/24)
Statement of Qualification Distribution Meeting
A Bridge Package 18 Design-Build Project Statement of Qualification Distribution Meeting will be held on June 24, 2024 at 11:30 am via Microsoft Teams.
The following is the WebEx login information:
Microsoft Teams Meeting Join on your computer or mobile app Click here to Join the Meeting
Meeting ID: 222 521 319 83 Passcode: Gq5CyB
Or call in (audio only) +1 803-529-1369,,724943560# United States, Columbia Phone Conference ID: 724 943 560#
Find a local number | Reset PIN| Learn More |Meeting options
Statement of Qualification Evaluation Meeting
A Bridge Package 18 Design-Build Project Statement of Qualification Evaluation Meeting will be held on July 10, 2024 at 8:30 am via Microsoft Teams.
The following is the WebEx login information:
Microsoft Teams Meeting Join on your computer or mobile app Click here to Join the Meeting
Meeting ID: 290 085 515 484 Passcode: dKGDuu
Or call in (audio only) +1 803-529-1369,,923093955# United States, Columbia Phone Conference ID: 923 093 955#
Find a local number | Reset PIN| Learn More |Meeting options
Design Build- Bridge Package 18-Return to Regular Session Meeting
A Bridge Package 18 Design-Build Project- Statement of Qualification Return to Regular Session Meeting will be held on July 16, 2024 at 8:30 am via Microsoft Teams.
The following is the WebEx login information:
Microsoft Teams Meeting Join on your computer or mobile app Click here to Join the Meeting
Meeting ID: 210 196 561 238 Passcode: j6MFAV
Or call in (audio only) +1 803-529-1369,,985439258# United States, Columbia Phone Conference ID: 985 439 258#
Find a local number | Reset PIN| Learn More |Meeting options