Emergency Bridge Package 2020-1

SCDOT proposes to replace one existing bridge along Timms Mill Road (S-174) Six & Twenty Creek in Anderson County and replace one existing bridge along Smith Ford Road (S-816) over Mud Creek in York County. The project will include replacing the existing bridges and associated roadway work.



Attachment B - Supplemental Project Design Criteria

Environmental

  1. R1_S-174 Timms Mill Road_PCE (04/03/20)
  2. S-816 over Mud Creek_PCE (03/24/20)

Hydraulics

  1. Toe Ditch Detail (03/24/20)
  2. SWPPP Checklist (03/24/20)




Survey

  1. S-174 Survey (03/27/20)
  2. R2_S-816 Survey (04/03/20)

Traffic

  1. S-4-174 Detour (03/24/20)
  2. S-46-816 Detour (03/24/20)

Project Information Package

Roadway

  1. S-174 (03/24/20)
  2. S-816 (03/24/20)

Structures

  1. S-174 SIA (03/24/20)
  2. S-816 SIA (03/24/20)
  3. Bridge DGN files (03/27/20)

Proposal Evaluation Committee Meeting

An Emergency Bridge Package 2020-1Technical Proposal Distribution Team Meeting will be held on April 9, 2020 at 10:30 AM via WebEx.

The following is the WebEx login information:

Thursday, April 9, 2020 10:30 am
Meeting number: 478 101 755
Password: bSN5hMPAD36
https://scdot.webex.com/webappng/sites/scdot/meeting/download/1e05e8e9f60744d49b542f951330fa90?siteurl=scdot&MTID=m22de734bc01ed71ca2dba6549cb410b0

Join by phone
+1-415-655-0001 US Toll
Access code: 478 101 755

Evaluation Committee Meeting Agenda


Notice to Parties Interested in Providing Design Build Services

Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.