SCDOT proposes to replace seven closed and load restricted secondary bridges in Chesterfield, Fairfield, Lancaster, and York counties. The project will include replacing the existing bridges and associated roadway work.

Bridge links below display the location in Google Maps.
Chesterfield County
Fairfield County
Lancaster County
York County
Requests for Proposals
- Non-Confidential Questions and Answers Round 2 (Posted 09/18/23)
- Request for Proposals - (Final with Revisions Highlighted) (Posted 09/08/23)
- Request for Proposals - (Final without Revisions Highlighted) (Posted 09/08/23)
- Non-Confidential Questions and Answers (Posted 09/08/23)
- Request for Proposals for Industry Review (Posted 08/21/23)
Request for Qualifications
- Short-listed Design Build Teams (Posted 08/21/23)
- SOQ Submitters List (Posted 08/01/23)
- Request for Qualifications – Addendum 1 (Posted 07/14/23)
- Notice to Proposers – Addendum 1 (Posted 07/14/23)
- Request for Qualifications (Posted 07/06/23)
Notice to Potential Proposers
- Early Coordination Meeting Presentation (Posted 06/14/23)
- Package 20 – Early Coordination Advertisement (Posted 05/11/23)
Attachment B - Supplemental Project Design Criteria
Bridge
- R1 Standard Box Beam Details (07/18/23)
- Acceptable Polymer Slurry Systems (07/06/23)
- Spray-Applied Bridge Deck Waterproofing Systems (07/06/23)
Construction
- Minimum SOV Items (08/21/23)
Environmental
- S-998 Wildcat Cultural Resource Boundary_GIS_files (08/21/23)
- NEPA Documents (09/08/23)
- PCE Attachments (09/08/23)
Geotechnical
Hazardous Materials
- Asbestos and Lead-Based Paint Reports (07/06/23)
Hydro
- Toe-Ditch-Detail (07/18/23)
- SWPPP Checklist (07/18/23)
- Package 20 Bridge Info (07/18/23)
Survey
- R1_Package 20 Surveys (08/21/23)
Traffic
- R1_Package 20 Detour Routes (08/21/23)
Roadway
- Package 20_Roadway Typical Sections (09/08/23)
SUE
- Package 20 SUE Files (09/08/23)
Project Information Package
Bridge
- R2 Conceptual Bridge Plans (08/21/23)
- SI&A Sheets (07/06/23)
- Conceptual Bridge Plan DGNs (07/18/23)
- Standard Box Beam Details (07/18/23)
Construction
- Complete-List-of-SOV-Items (08/21/23)
Environmental
- CLRB Package 20_Delineated Waters (09/08/23)
- CLRB 20 Supplemental Environmental Info (09/08/23)
Hydro
- SCDHEC Permitting Time Chart (07/18/23)
- Hydro Memos and Models (07/18/23)
Roadway
- R1_Package 20_Conceptual Roadway Plans (08/21/23)
- R1_Package 20_Conceptual Roadway DGN Files (08/21/23)
- Conceptual Trail Plans (09/08/23)
Utilities
- Utility Information for RFP (08/21/23)
Geotechnical
- Geotechnical Baseline Reports (08/22/23)
Statement of Qualification Evaluation Meeting
A Bridge Package 20 Design-Build Project Statement of Qualification Distribution Meeting will be held on July 28, 2023 at 9:00 am via Microsoft Teams.
The following is the WebEx login information:
Microsoft Teams Meeting Join on your computer or mobile app Click here to Join the Meeting
Meeting ID: 291 657 783 639 Passcode: VzeVsz
Or call in (audio only) +1 803-529-1369,,104431744# United States, Columbia Phone Conference ID: 104 431 744#
Find a local number | Reset PIN| Learn More |Meeting options
Statement of Qualification Evaluation Meeting
A Bridge Package 20 Design-Build Project Statement of Qualification Evaluation Meeting will be held on August 15, 2023 at 8:30 am via Microsoft Teams.
The following is the WebEx login information:
Microsoft Teams Meeting Join on your computer or mobile app Click here to Join the Meeting
Meeting ID: 274 730 135 053 Passcode: wXRtbg
Or call in (audio only) +1 803-529-1369,,243447383# United States, Columbia Phone Conference ID: 243 447 383#
Find a local number | Reset PIN| Learn More |Meeting options