Interstate 77 Panther Interchange Project

In order to provide access to the adjacent proposed Carolina Panther development and surrounding area, the South Carolina Department of Transportation (SCDOT) proposes the creation of a new full access interstate interchange on I-77 in York County. The proposed interchange will provide access from I-77 to the new boulevard which is approximately 1 mile south of US 21 Bypass/Cherry Rd (Exit 82) and approximately 1.5 miles north of SC 122/Dave Lyle Blvd (Exit 79).

Request for Proposals

Notice of Award (Posted 01/27/21)
Bid Summary Report (Posted 12/15/20)
Request for Proposals Addendum 4 (Posted 11/25/20)
Notice to Proposers Addendum 4 (Posted 11/25/20)
Request for Proposals Addendum 3 (Posted 11/18/20)
Notice to Proposers Addendum 3 (Posted 11/18/20)
Request for Proposals Addendum 2 (Posted 11/09/20)
Notice to Proposers Addendum 2 (Posted 11/09/20)
R4 Non-Confidential Questions and Responses (Posted 11/24/20)
Request for Proposals Addendum 1 (Posted 10/21/20)
Notice to Proposers Addendum 1 (Posted 10/21/20)
RFP (Final without Revisions Highlighted) (Posted 10/15/20)
RFP (Final with Revisions Highlighted) (Posted 10/19/20)
RFP for Industry Review (Posted 09/24/20)

Request for Qualifications

Short Listed Design Build Teams (Posted 09/23/20)
SOQ Submitters List (Posted 12/04/20)
Notice to Proposers Addendum 1 (Posted 08/14/20)
Request for Qualifications Addendum 1 (Posted 08/04/20)
Request for Qualifications (Posted 7/28/20)

Notice to Potential Proposers

Early Coordination Presentation (Posted 01/22/20)
Early Coordination Advertisement (Posted 12/20/19)

Attachment B - Supplemental Project Design Criteria

Hydrology

  1. Toe Ditch Detail (07/28/20)
  2. SWPPP Checklist (07/28/20)
  3. Project Inspector Pipe Inspections R1 (11/09/20)
  4. Proposed Land Use (10/12/20)
  5. Gekko As-Built Analysis (11/09/20)
  6. Gekko Drainage Areas (11/09/20)
  7. Gekko Pond As-Built_R1 (11/18/20)
  8. City of Rock Hill E&C Checklist (11/09/20)
  9. SWPPP Checklist City of Rock Hill (11/09/20)

Traffic

  1. Conceptual Signing Plan (09/24/20)
  2. ITS Standard Drawings (09/24/20)
  3. Traffic Signals Plan Preparation Requirements (09/24/20)
  4. 5. Mast Arm Pole Detail per City of Rock Hill (09/24/20)
  5. Vehicle Detection Specification (09/24/20)
  6. Mast Arm LED Signs (09/24/20)
  7. Street Lighting Fiberglass Pole Detail (09/24/20)
  8. Approved IJR (10/21/20)
  9. Conceptual Signing Plan Layouts (10/12/20)
  10. Street Lighting Fiberglass Pole Detail Standard (11/10/20)
  11. Street Light Assembly (11/10/20)
  12. Sign Barcode Form (11/10/20)
  13. SCDOT Supplemental Specifications for Roadway Lighting (11/18/20)
  14. Street Lighting Equipment (11/18/20)


Proposal Evaluation Committee Meeting

An I-77 Panther Interchange Technical Proposal Evaluation Meeting will be held on December 9, 2020 at 9:00 AM via WebEx.

The following is the WebEx login information:

Wednesday, December 9, 2020 9:00 AM
Meeting number: 180 321 6797
Password: AXvJ5rkTU68
https://scdot.webex.com/webappng/sites/scdot/meeting/download/cf9fefe9ee66472e82467a884c38a751?siteurl=scdot&MTID=ma1e07ba84031a089026d787444d72d11

Join by phone
+1-415-655-0001 US Toll
Access code: 180 547 8676


SCDOT will reconvene the I-77 Panther Interchange Technical Proposal Evaluation Meeting on December 14, 2020 at 1:30 PM via WebEx.

The following is the WebEx login information:

Monday, December 14, 2020 1:30 PM
Meeting number (access code): 180 922 5504
Password: trVE7PWUb23
https://scdot.webex.com/webappng/sites/scdot/meeting/download/46d0800fafae42f5ae4057cbe4a4e196?siteurl=scdot&MTID=m8bb53d2e9572935e68b63f5d0fa1cf86

Join by phone
+1-415-655-0001 US Toll
Access code: 180 922 5504

Technical Proposal Meeting Agenda

Proposal Evaluation Committee Meeting

An I-77 Panther Interchange Technical Proposal Distribution Team Meeting will be held on December 1, 2020 at 2:55 PM via WebEx.

The following is the WebEx login information:

Tuesday, December 1, 2020 2:55 PM
Meeting number (access code): 180 547 8676
Password: Mvgg8pPMm23
https://scdot.webex.com/scdot/j.php?MTID=mc26e6bea13ced8373d0c95ae7f950af4

Join by phone
+1-415-655-0001 US Toll
Access code: 180 547 8676

Technical Proposal Distribution Committee Meeting

Statement of Qualifications Evaluation Team Meetings

An Interstate 77 Panther Interchange SOQ Evaluation Meeting will be held September 15, 2020 at 9:00 AM via WebEx.

The following is the WebEx login information:

Tuesday, September 15, 2020 9:00 am
Meeting number (access code): 172 405 3546
Password: iYTKDpJ7m42
https://scdot.webex.com/scdot/j.php?MTID=m4de2fb2ed4e177e5e1a95bc7dd797efc

Join by phone
+1-415-655-0001 US Toll
Access code: 172 405 3546

SOQ Meeting

Statement of Qualifications Evaluation Team Meetings

An Interstate 77 Panther Interchange SOQ Distribution Meeting will be held on August 21, 2020 at 10:30am.

The following is the WebEx login information:

Friday, Aug 21, 2020 10:30 am
Meeting number: 160 950 7150
Password: qwDdJVGg334
https://scdot.webex.com/scdot/j.php?MTID=mf701080a459b9cb4b5e4761e6006b1ad

Join by phone
+1-415-655-0001 US Toll
Access code: 160 950 7150

Evaluation Committee Meeting


Notice to Parties Interested in Providing Design Build Services

Qualifications and/or proposals from any contracting entity must utilize the new ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.