This project will replace the existing structurally deficient bridges and roadway approaches with new infrastructure along Interstate 95 over Lake Marion. The project is needed in order to continue to provide a safe and efficient transportation system to move people and goods along the I-95 corridor.
Notice to Proposers
- I-95 over Lake Marion - Early Coordination Meeting (Posted 9/26/24)
- I-95 over Lake Marion - Early Coordination Advertisement (Posted 9/9/24)
Request for Qualifications
- Notice to Proposers - Addendum 1.pdf (Posted 10/10/24)
- Request for Qualifications - Addendum 1 (Posted 10/10/24)
- Request for Qualifications (Posted 10/7/24)
Project Information Package
Bridge
- SI&A (10/7/24)
- Vessel Collision Memo (10/7/24)
Environmental
- SAC-2023-00857 PJD Letter (10/7/24)
- 2023-07-17 JD lines Lake Marion (10/7/24)
- I-95_Lake_Marion_P041130_Approved CE+Apps (10/7/24)
Geotechnical
- Geotechnical Baseline Report (10/7/24)
- Geotechnical Subsurface Data Report (10/7/24)
- Field Testing Data Files (10/7/24)
Hazardous Materials
- Asbestos and Lead-Based Paint Reports (10/7/24)
Hydro
- I-95 over Lake Marion Hydraulic Report (10/7/24)
- I-95 over Lake Marion Pipe Inspection Report (10/7/24)
Roadway
Survey
- I-95 over Lake Marion Survey Files (10/7/24)
Traffic
- I-95 Over Lake Marion_Traffic Study (10/7/24)
Early Coordination Open-Forum Meeting
An I-95 over Lake Marion Bridge Replacement Early Coordination Open-Forum Meeting will be held on September 26, 2024 at 11:00 am via Microsoft Teams.
The following is the Microsoft Teams login information:
Microsoft Teams Meeting
Join on your computer or mobile app Click here to Join the MeetingMeeting ID: 225 149 333 966 Passcode: Dk9N7g
Or call in (audio only) 1 803-529-1369,,95850181# United States, Columbia Phone Conference ID: 921 718 139#