Columbia, S.C. (March 27, 2026) - The South Carolina Department of Transportation will close and detour the SC 200 bridge over Minton Creek in Fairfield County for a bridge replacement on April 1.
The bridge is expected to reopen summer 2027. As part of this closure a detour route has been set up. A map of the detour can be found below. Please note that SC 200 will be open to local traffic only, except at the bridge site.
SCDOT asks that drivers slow down and pay attention to signs and crews when driving through the area.