[Insert Title Here]

[insert project description along with location of work]

If Bridge Project:

Google Maps icon

Bridge links below display the location in Google Maps.

[Insert County Here]

Executed Contract (when available)

Attachment B - Supplemental Project Design Criteria

Construction

  1. Project ID_Item Name (x/xx/xx)

Environmental

  1. Project ID_Item Name (x/xx/xx)

Geotechnical

  1. Project ID_Item Name (x/xx/xx)

Hazardous Materials

  1. Project ID_Item Name (x/xx/xx)

Hydro

  1. Project ID_Item Name (x/xx/xx)

Roadway

  1. Project ID_Item Name (x/xx/xx)

Structures

  1. Project ID_Item Name (x/xx/xx)

Survey

  1. Project ID_Item Name (x/xx/xx)

Traffic

  1. Project ID_Item Name (x/xx/xx)

Project Information Package

Construction

  1. Project ID_Item Name (x/xx/xx)

Environmental

  1. Project ID_Item Name (x/xx/xx)

Geotechnical

  1. Project ID_Item Name (x/xx/xx)

Hazardous Materials

  1. Project ID_Item Name (x/xx/xx)

Hydro

  1. Project ID_Item Name (x/xx/xx)

Roadway

  1. Project ID_Item Name (x/xx/xx)

Structures

  1. Project ID_Item Name (x/xx/xx)

Survey

  1. Project ID_Item Name (x/xx/xx)

Traffic

  1. Project ID_Item Name (x/xx/xx)

Procurement Documents

Statement of Qualification Distribution Meeting

Statement of Qualification Evaluation Meeting

Technical Proposal Distribution Meeting

Technical Proposal Evaluation Meeting