Project Description
SCDOT proposes to replace the existing US 76 bridge over the Chauga River through an emergency procurement process. The replacement will bring the bridge and adjoining approach roadway up to current SCDOT design and safety standards. The new bridge will be constructed on alignment and utilize a traffic detour from September 2024 and throughout project construction.
Anticipated Schedule
Emergency Design-Build Contract Awarded:
TBD
Final Design Completed:
TBD
Begin Construction:
TBD
Substantial Project Completion:
TBD