SCDOT home Skip to Main Content
Home  |  Accessibility  |  DOT Resources  |  Disclaimer  |  Contact Us  |  Site Map  | 
Inside SCDOT Getting Around in SC Doing Business with SCDOT Public Forum Community Service
Inside SCDOT
Skip to Body Content

Featured Construction Projects

Review Project Status
I-73 Study
Palmetto Parkway
US 17 ACE Basin Parkway - Segment 1

Personnel


District Directory
Employment Opportunities
Classification and Compensation
Visitor Parking

Leadership

Meet the Governor
Meet the Administration
Meet the Commission
Commission Meetings
Commission Minutes

Finance

Highway Policy
Revenues and Expenditures
Innovative Financing
Spending Transparency

Quarterly Reporting

Dashboard

Planning

Transportation Planning
STIP Report
Metropolitan Planning Organization
MPO TIPS
Frequently Asked Questions
Multimodal Transportation Plan
Transit Planning
State Priority Projects
Public Comment (Planning)
Public Partipation Plan

Public Service

Speakers Bureau

Publications

Best Management Practices
Annual Accountability Report
SCDOT Economic Impact
The Connector
STIP Report
Press Releases
Strategic Plan
Multimodal Transportation Plan
Map of Connector Project

Project Description

Briggs-DeLaine-Pearson Connector

The Briggs-DeLaine-Pearson Connector will be a new 9-mile, two-lane roadway and bridge between Lone Star in Calhoun County and Rimini in Clarendon and Sumter Counties.

A three-mile-long bridge will span Lake Marion, extending to the limits of the lake's 100-year floodplain to minimize any impacts to the wetlands and floodplain.

The alignment begins at the intersection of S. C. Route 33 and S. C. Route 267, near Lone Star and extends in a southeasterly direction towards the CSX Railroad track. It then remains north of and parallel to the existing CSX Railroad track and trestle across the Santee River, marshland and Lake Marion touching down adjacent to Pack's Landing. From there, the alignment continues to parallel the RR track, turns in a northeasterly direction, crosses Road S-51 and terminates at the intersection of Road S-52 and Road S-658. The distance between the bridge and the RR track varies between 100' and 180' in an effort to locate the bridge as close as possible to the existing structure.

 

Briggs-DeLaine-
Pearson Connector

Project Background

  The Purpose and Need
Project Description
Financing

Work to Date

  Preliminary Engineering
Right of Way
Construction

Community Interest

  Meetings

Environment

  Sensitive Practices
Sparkleberry Swamp

   
 

Inside SCDOT |  Getting Around in SC |  Doing Business with SCDOT |  Public Forum |  Community Service
Home  |  DOT Resources |  Disclaimer |  Privacy |  Contact Us |  Site Map

SC.gov
Property of the South Carolina Department of Transportation. Please refer to the SCDOT's Internet Disclaimer for proper usage of this site.
Updated 05/23/07