SCDOT home Skip to Main Content
Home  |  Accessibility  |  DOT Resources  |  Disclaimer  |  Contact Us  |  Site Map  | 
Inside SCDOT Getting Around in SC Doing Business with SCDOT Public Forum Community Service
Inside SCDOT
Skip to Body Content

Featured Construction Projects

Active Projects
I-385 Rehab
I-73 Study
Palmetto Parkway
US 17 ACE Basin Parkway - Segment 1
Ben Sawyer Bridge
I-26 Remount and Aviation Improvements

Personnel


District Directory
Employment Opportunities
Classification and Compensation
Headquarters Visitors
Notice of Non-Discrimination in Employment
Workplace Violence Policy and Form
Sexual Harassment Policy

Leadership

Meet the Governor
Meet the Administration
Meet the Commission
Commission Meetings
Commission Minutes

Finance

Economic Stimulus Plan
Highway Policy
Revenues and Expenditures
Innovative Financing
Spending Transparency
Fraud and Ethics Hotline
Meet the SIB Board

Internal Audit

Office of the Chief Internal Auditor

Reports

Dashboard
Traffic Fatalities

Reports

Dashboard
Traffic Fatalities

Planning

Transportation Planning
STIP Report
Metropolitan Planning Organization
MPO TIPS
Frequently Asked Questions
Multimodal Transportation Plan
Transit Planning
State Priority Projects
Public Comment (Planning)
Public Partipation Plan

Public Service

Speakers Bureau

Publications

Best Management Practices
Annual Accountability Report
SCDOT Economic Impact
The Connector
STIP Report
Press Releases
Strategic Plan
Multimodal Transportation Plan
Cars driving down a road through dense trees


SCDOT
Strategic Plan

2008 - 2010

Download the Strategic Plan (1.02Mb PDF)

A strategic plan is a plan that sets direction for the future. The SCDOT Strategic Plan is a living document, updated every two years. The planning, input, and implementation of the Strategic Plan is vital to the success of SCDOT.

Our MISSION

“The department shall have as its functions and purposes the systematic planning, construction, maintenance, and operation of the state highway system and the development of a statewide mass transit system that is consistent with the needs and desires of South Carolina citizens. The goal of the department is to provide adequate, safe, and efficient transportation services for the movement of people and goods.”
Section 57-1-30

Our VISION is Connecting South Carolina.

There are 6 goals set by the agency with two objectives each. These are listed below:

    Increase SAFETY both on South Carolina’s highway system and within SCDOT by reducing lost work days, traffic fatalities, and traffic injuries.

    Objectives
    • Reduce traffic fatalities by 25 people per year, and reduce traffic crashes by 3 percent each year.
    • Reduce lost workdays by 5 percent

space

    Ensure South Carolina’s future by making transportation MOBILITY options more accessible, convenient, efficient, and easily integrated with existing infrastructures that allows the timely delivery of goods and services.

    Objectives
    • Reduce congestion on interstates and other major state roads.
    • Increase the use of alternative mobility options in urban and rural areas.

space

    Maintain a quality WORKFORCE of existing and future employees.

    Objectives
    • Develop new programs to attract entry-level engineers through recruitment, innovations, and cross training by June 2010.
    • Reduce the time to fill a vacancy by 5 percent through recruiting, retention, hiring processes, training resources and streamlining paperwork and processes.

space

    Conserve RESOURCES throughout the agency.

    Objectives
    • Identify and implement twenty-five new areas where resources can be measured and streamlined annually to save costs agency-wide.
    • Implement an agency-wide, central repository document management system through the coordination of existing systems by June 2010.

space

    Continue a proactive approach in SYSTEM PRESERVATION by maintaining our existing highways, through preventive maintenance, rehabilitation, and responsive maintenance.

    Objectives
    • Stop the upward trend in the number of state-owned structurally deficient bridges at a level of 6.175 million square feet by June 2010.
    • Utilize the pavement improvement and preservation program to eliminate the decline of the average remaining service life (RSL) and maintain the current condition of our transportation system by December 2012.

space

    Advance SCDOT’s CUSTOMER SERVICE through the ability to manage for results and promote transportation solutions that enhance communities and protect the natural and built environment.

    Objectives
    • Identify twenty-five areas where we can improve products, services, and information.
    • Improve and maintain customer satisfaction ratings for both internal and external customers and consolidate all results into a report.

 

Questions or Comments

You are also vital to the success of the plan! If you have a question or comment concerning information found within the SCDOT Strategic Plan, please feel free to contact us:

Name

Email

Comment

 


You will need Adobe Reader to view the Strategic Plan.Spacer

Adobe Reader Download Link


Inside SCDOT |  Getting Around in SC |  Doing Business with SCDOT |  Public Forum |  Community Service
Home  |  DOT Resources |  Disclaimer |  Privacy |  Contact Us |  Site Map

SC.gov
Property of the South Carolina Department of Transportation. Please refer to the SCDOT's Internet Disclaimer for proper usage of this site.
Updated 02/02/09