| Beaufort County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
HWY 802
|
|
Rue DuBois Rd.
|
|
|
Expect flagging operations on HWY 802 near the intersection of Rue DuBois Rd. beg. 11/18 from 7 pm to 6 am, and on 11/19 from 9 am to 4 pm. |
|
|
| Berkeley County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
I-526 EB & WB (Don Holt Bridge)
|
|
MP 10.49
|
|
MP 12.55
|
Expect alternating lane closures in both directions on I-526 from 9 pm to 5 am beg. 10/26 through 10/29, 11/2 through 11/5, 11/9 through 11/12, and 11/16 through 11/19. |
|
|
|
I-526 EB & WB (Don Holt Bridge)
|
|
MP 10.49
|
|
MP 12.55
|
Expect lane closures in both directions on I-526 from 9 pm to 5 am beg. 11/23 through 11/24, and 11/30 through 12/3. |
|
|
|
S-973 (Compton Drive)
|
|
Intersection of S-1182 (Farrell Street)
|
|
|
Expect an ALL-WAY STOP to be implemented on S-973 (Compton Drive) at the intersection of S-1182 (Farrell Street) beg. 12/2 at 9:00 am until further notice. |
|
|
| Charleston County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
I-26 EB
|
|
MP 205
|
|
MP 207
|
Expect the inside lane of I-26 EB to be closed beg. 11/19 at 9 pm to 11/20 at 5 am. |
|
|
|
I-26 WB
|
|
Exit 218 (SR-52)
|
|
Exit 215 (Dorchester Rd.)
|
Expect the left and center lanes to be closed beg. 11/18 through 11/21 from 8 pm to 6am. |
|
|
|
I-26 WB
|
|
Exit 217
|
|
|
Expect exit 217 on I-26 WB to be closed beg 11/19 from 8 pm to 6 am, 11/20 from 8 pm to 10 am, and 11/21 from 8 pm to 9 am. |
|
|
|
I-526 EB & WB (Don Holt Bridge)
|
|
MP 10.49
|
|
MP 12.55
|
Expect alternating lane closures in both directions on I-526 from 9 pm to 5 am beg. 10/26 through 10/29, 11/2 through 11/5, 11/9 through 11/12, and 11/16 through 11/19. |
|
|
|
I-526 EB (Don Holt Bridge)
|
|
North Rhett (MP 7.62)
|
|
Clements Ferry Rd. (MP 9.63)
|
Expect various lanes to be closed for work on fog mitigation lights on I-526 EB beg. 11/14 through 11/20 from 9 pm to 6 am. |
|
|
|
Wappoo Bridge (SC 171)
|
|
|
|
|
Expect the Wappoo Bridge to be closed for repairs beg. 11/20 from 1 am to 5 am. The James Island Connector on SC 30 can be used as an alternative route. |
|
|
|
Remount Rd.
|
|
Rivers Ave.
|
|
Air Park Rd.
|
Expect this section of Remount Rd. to be closed beginning July 18, 2009 at 2:00 a.m. for approx. 4 months in order to construct the new Remount/I-26 interchange. Detour routes will be posted. |
|
|
|
S-1958 (Brickyard Rd.)
|
|
Bridge over Tidal Creek
|
|
on Johns Island
|
This bridge replacement project will begin July 27, 2009 and is expected to be completed by April 30, 2010. The bridge will have one lane open to traffic for the complete length of the project. |
|
|
| Colleton County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
S-114 Bridge o/ Black Creek
|
|
7.3 Miles SW of Walterboro on Cane Branch Rd.
|
|
|
Expect a closure of the bridge on S-114 o/ Black Creek beg. 10/19 through 12/18. The closure is necessary for the bridge to be replaced. A detour route will be posted. |
|
|
| Jasper County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
Highway 17
|
|
MP 26.05
|
|
MP 28.47
|
Expect delays and lane closures starting at Woodlawn St going South out of Ridgeland just past Exit 18 for road construction activies from August 17-Nov. 30, 09, 7am-7PM. Traffic control devices will be in place. |
|
|
|
SC-19 (Knowles Island Rd) Bridge
|
|
o/ Knowles Creek
|
|
|
Expect traffic to be reduced to one lane beg. 10/19/09 through 6/30/2010 to replace the bridge on SC-19 (Knowles Island Rd.) o/ Knowles Island Creek. |
|
|
|
Bailey Mill Rd. NB & SB
|
|
MP 3.00
|
|
MP 4.00
|
Expect the NB right lane and the SB right lane on Bailey Mill Rd. to be closed beg. 11/16 through 11/26 from 9 am to 4 pm. |
|
|