| Darlington County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
SC 34
|
|
S-1197
|
|
SC 34 Conn
|
Possible lane closures for sidewalk construction |
|
|
|
McIver Road
|
|
US 52
|
|
S-255 (Brockington Rd)
|
Possible lane closures for roadway reclamation |
|
|
| Dillon County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
I-95
|
|
Big Pee Dee River
|
|
SC-9 in Dillon County
|
Possible lane closures for road repair |
|
|
|
Cleveland St
|
|
S-79
|
|
S-103
|
Possible lane closures for sidewalk construction |
|
|
| Florence County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
I-95
|
|
I 20
|
|
Big Pee Dee River
|
Possible lane closures for road repair |
|
|
|
US 378
|
|
Bridge over
|
|
Big Pee Dee River
|
Possible lane closures for bridge construction. |
|
|
|
US 52
|
|
.2 mile north of S-1109
|
|
SC 51(Pamplico Hwy)
|
Possible lane closures for patching, resurfacing, and placement of pavement markers. |
|
|
|
Ashby Rd
|
|
At the intersection of
|
|
S-358 and S-26 (McIver Rd)
|
Possible land closures for intersection improvement. |
|
|
|
Cherokee Rd
|
|
US 76
|
|
US 52
|
Possible lane closures for road patching, resurfacing, and placement of pavement markers. |
|
|
|
Ebenezer Rd
|
|
1 mile before intersection with Pineneedles Rd
|
|
1 mile after intersection with Pineneedles Rd
|
Possible lane closures for road construction |
|
|
|
Evans St
|
|
US 76
|
|
S-29 (Cashua St)
|
Possible lane closures between 7 PM and 6 AM Sunday thur Thursday for paving, patching, and installation of pavement marker |
|
|
|
Koppers Road
|
|
Koppers Road
|
|
at CSX railroad crossing
|
Railroad repairs |
|
|
|
Pineneedles Rd
|
|
S-112 (Elbenezer Rd)
|
|
West for 1.6 miles
|
Widen Pineneedles Rd. and bridge of I-95 |
|
|
|
Third Loop Rd
|
|
S-29 (Cashua Dr)
|
|
S-588(McGown Dr)
|
Possible lane closures for patching, resurfacing, and placement of pavement markers. |
|
|
| Horry County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
US 17
|
|
SC 707
|
|
Brookgreen Gardens
|
Possible night time lane clourse for milling and resurfacing |
|
|
|
US 378
|
|
Replace bridge over
|
|
Little Pee Dee River
|
Possible lane closures for bridge replacement |
|
|
|
US 501
|
|
US 17 Frontage road
|
|
East of 3 rd Avenue South
|
Possible night time lane closures |
|
|
|
SC 9
|
|
S-20 (Sea Mountain Hwy)
|
|
S-1332 (Plantation Dr)
|
Possible night time lane closures for road work |
|
|
| Marion County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
US 378
|
|
SC 908
|
|
2 miles East of Little Pee Dee River
|
Possible lane closures for utility work and clearing |
|
|
|
S-9
|
|
US 378
|
|
Wall Rd
|
Possible lane closures for reclamation work and paving |
|
|
| Marlboro County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
US 15
|
|
Near the intersection
|
|
of S-728 and US 15
|
Possible lane closures for sidewalk construction |
|
|
|
(E Main St
|
|
SC 385
|
|
US 15/401
|
Possible lane closures for paving |
|
|
|
Cottingham Blvd
|
|
SC-9 B Mile Point:12
|
|
US-401 Mile Point:17
|
Possible land closures for road improvements |
|
|
|
SC 38
|
|
Near the intersection
|
|
of S-430 and SC 38
|
Possible lane closures for sidewalk construction |
|
|
|
S-494
|
|
Near the intersection
|
|
of S-728 and S-494
|
Possible lane closures for sidewalk construction |
|
|
| Williamsburg County |
| Road Name |
|
From |
|
To |
Description |
|
|
 |
|
Eastland Av
|
|
SC 261
|
|
US 52
|
Possible lane closures for shoulder widening and resurfacing |
|
|
|
IM Graham RD
|
|
S-186 (Eastland Av)
|
|
S-456
|
Possible lane closures for shoulder widening and resurfacing |
|
|