Doing Business with South Carolina Department of Transportation

Port Access Road

The Port Access Road is a new roadway and structure project to provide direct access between the proposed marine container terminal location on the former Navy Base and I-26 while maintaining adequate service for local, commuter, and commercial traffic. Included in the Project's purpose is the intent to safely integrate container terminal traffic with existing traffic; support local and regional planning policies and strategies; and minimizing adverse impacts on communities and the environment. The Project consists of the construction of a new fully directional interchange on I-26, a Bainbridge Connector Road, the extension of Stromboli Avenue and associated roadway improvements to surface streets to serve the proposed Naval Base Terminal (NBT) in Charleston County, South Carolina. Information documents for contractors can be found below.

Request for Proposals

Request for Concurrence in Award Memo (Posted 4/19/16)
Notice to Proposers - Addendum 6 (Posted 3/18/16)
Request for Proposals - (Final with Addendum 6) (Posted 3/18/16)
Notice to Proposers - Addendum 5 (Posted 3/4/16)
Request for Proposals - (Final with Addendum 5) (Posted 3/4/16)
Notice to Proposers - Addendum 4 (Posted 2/12/16)
Request for Proposals - (Final with Addendum 4) (Posted 2/12/16)
Notice to Proposers - Addendum 3 (Posted 2/2/16)
Request for Proposals (Final with Addendum 3) (Posted 2/2/16)
Notice to Proposers - Addendum 2 (Posted 1/15/16)
Request for Proposals - (Final with Addendum 2) (Posted 1/15/16)
Notice to Proposers - Addendum 1 (Posted 12/3/15)
Request for Proposals - (Final with Addendum 1) (Posted 12/3/15)
Request for Proposals (Final without Revisions Highlighted) (Posted 11/6/15)
Request for Proposals (Final with Revisions Highlighted) (Posted 11/5/15)
Request for Proposals (Industry Review) (Posted 8/27/15)

Request for Qualifications

Short-Listed Design Build Teams (PDF 330 Kb) (Posted 8/3/15)
Request for Qualifications (PDF 114 Kb) (Posted 6/18/15)
Notice to Proposers - Addendum 1 (PDF 30 Kb) (Posted 6/10/15)
Notice to Proposers - Addendum 2 (PDF 33 Kb) (Posted 6/18/15)
SOQ Submitters List (PDF 96 Kb) (Posted 6/30/15)

Project Information Package

Attachment B - Supplemental Project Design Criteria

Environmental

  1. USACE Individual Permit (Posted 11/18/15)
  2. OCRM Permit and CZC Certification (Posted 11/18/15)
  3. Noise Study (Posted 8/27/15)
  4. Permit Extensions (Posted 8/27/15)
  5. Final Noise Study (Posted 10/26/15)
  6. Noise Study TNM Files (Posted 10/26/15)
  7. Wetland DGN File (Posted 11/5/15)
  8. Appendix H - ARFS Supplemental Report - Plan & Profile Sheets (Posted 11/5/15)

Forms

  1. Drilled Shaft Forms (Posted 8/27/15)
  2. Pile and Driving Equipment Data Form (Posted 8/27/15)
  3. Contractor Certification Form (Posted 11/5/15)

Hazardous Materials

  1. SCDHEC Hazmat Concurrence Letter (Posted 11/5/15)
  2. EPA Email - Solvay Phosphogypsum Stack (Posted 11/5/15)

Rail Road

  1. CSXT Response (Posted 8/27/15)
  2. NS Response (Posted 8/27/15)
  3. CSXT Follow-up (Posted 11/5/15)
  4. Palmetto Railways Concept (Posted 12/2/15)
  5. NS Response 2 (Posted 11/5/15)

Right of Way

  1. On Call Right of Way Consultant List (Posted 11/5/15)
  2. Active Fee Appraiser and Reviewer Lists (Posted 11/5/15)
  3. Right of Way Status Report - March 2016 Update (Posted 3/17/16)

Roadway

  1. Port Access Roadway Aerial (Posted 5/28/15)
  2. Drawing 805-710-SP (Posted 11/5/15)
  3. Site Plan Southern Lumber (Posted 11/5/15)
  4. Remove Summerville Avenue (Posted 11/5/15)
  5. 2025 Peak Hour Traffic Volumes (Posted 11/5/15)
  6. Right of Way Plans - May 12, 2009 (Removed 2/17/16)
  7. Right of Way Plans - Revised February 3 2016 (Removed 2/17/16)
  8. Right of Way Plans (May 12, 2009) - Revised February 16, 2016 (Posted 2/16/16)
  9. Right of Way Plans (May 12, 2009) - Revised May 16, 2016 (Posted 5/17/16)

Structures

  1. Typical Sections of I-26 Showing Future Eight Lane Section (Posted 8/27/15)
  2. Minimum Bridge Deck Widths (Posted 8/27/15)
  3. Barrier Parapet Extension (Posted 8/27/15)
  4. Typical Sections of I-26 Showing Future Eight Lane Section - Revision 1 (Posted 1/15/16)
  5. Minimum Bridge Deck Widths - Revision 1 (Posted 1/15/16)

Traffic

  1. Interchange Modification Report (Posted 5/28/15)
  2. Final Conceptual Ports Signing (Posted 3/9/16)

Utilities

  1. Subsurface Utility Exploration (SUE) Files (Posted 5/28/15)

Attachment C- Project Information Page

Environmental

  1. Environmental Impact Statement (Posted 5/28/15)
  2. Record of Decision (Posted 5/28/15)
  3. Interchange Environmental Assessment (EA) (Posted 9/25/15)
  4. Interchange Finding of No Significant Impact (FONSI) (Posted 5/28/15)
  5. Public Meeting Display (Posted 10/12/15)

Geotechnical

  1. Geotechnical Base Line Report (Posted 8/27/15)
  2. Site-Specific Response Analysis Report (Posted 8/27/15)
  3. Charleston Naval Base Container Terminal (Posted 8/28/15)
  4. Geotechnical Field Data & Prelim. Design Files (Posted 10/13/15)
  5. Boring Log B-9 (Posted 2/25/16)

Hazardous Materials

  1. Phase I Environmental Site Assessment (Posted 5/28/15)
  2. Environmental Data Summary Report (Posted 8/27/15)
  3. Summary of Environmental and Geotechnical Considerations (Posted 8/27/15)
  4. Exit 217 - Asbestos (Posted 8/27/15)
  5. Exit 217 - Lead Paint (Posted 8/27/15)
  6. Exit 218 - Structure # 101002600991 - Asbestos (Posted 8/27/15)
  7. Exit 218 - Structure # 101002600991 - Lead Paint (Posted 8/27/15)
  8. Exit 218 - Structure # 101002600992 - Asbestos (Posted 8/27/15)
  9. Exit 218 - Structure # 101002600992 - Lead Paint (Posted 8/27/15)
  10. Solvay Permits (Posted 8/27/15)
  11. Macalloy (Posted 11/5/15)
  12. Navy Dig Permit - SC Ports Authority (Posted 11/5/15)
  13. Navy Base - Proposed VCC (Posted 11/5/15)

Hydraulics

  1. Macalloy SW As Builts (Posted 11/5/15)

Pavement

  1. Pavement Advisory Memorandum. (Posted 5/28/15)
  2. Traffic Data. (Posted 9/3/15)

Railroad

  1. Sample CSXT Agreement (Posted 11/5/15)
  2. Sample_NS_Agreement (Posted 11/5/15)
  3. CSXT Survey Cooper Yard (Posted 2/3/16)

Right of Way

  1. ROW Property Interest Document (Posted 9/3/15)
  2. ROW Property Interest Documents Part 2 (Posted 11/5/15)

Roadway

  1. NBIF Drayage Road over SCDOT Port Access Road (Posted 11/5/15)
  2. Roadway and Right-of-Way Design File (Posted 8/27/15)
  3. New Roadway and Right-of-Way Design File (Posted 11/5/15)
  4. Standard Dwg 805-525-XX ( Removed 2/11/16)
  5. Updated Roadway Design Files (Posted 2/16/16)
  6. Survey Control Data (Posted 3/17/16)

Structures

  1. SI&A Reports (Posted 5/28/15)
  2. Existing Bridge Plans (Posted 8/27/15)
  3. Inspection Reports (Posted 8/27/15)

Traffic

  1. Interchange Modification Report Files (Posted 11/5/15)
  2. Spruill Ave Lane Reduction Request (Posted 11/5/15)
  3. Spruill Ave Lane Reduction Final Report (Posted 11/5/15)
  4. Signing Plan DGN File (Posted 12/09/2015)
  5. SignCAD Files (Posted 12/22/2015)

Utilities

  1. Santee Cooper Info (Posted 8/27/15)
  2. SCE&G Info (Posted 8/27/15)
  3. Proposed UA SCE&G Gas (Posted 11/5/15)
  4. SCE&G Gas Plan Schedule (Posted 11/5/15)
  5. SCE&G Follow-Up (Posted 11/5/15)
  6. Santee Cooper Follow-Up (Posted 11/5/15)
  7. Santee Cooper Update (Posted 11/5/15)
  8. Santee Cooper Update 2 (Posted 1/15/16)
  9. SCE&G Gas UA Final (Posted 1/15/16)

Evaluation Team Meetings

Port Access Road Proposal Evaluation Team meeting will be held on April 11, 2016, at 9:00 AM in Conference Room 421 at SCDOT Headquarters.

Evaluation Team Meeting Agenda (PDF 25.3 Kb) (Posted 4/08/16)

An Evaluation Committee meeting to distribute the Technical Proposals will be held on March 31, 2016, at 2:00 PM in Room 421 in SCDOT Headquarters.

Evaluation Team Meeting Agenda (PDF 25.3 Kb) (Posted 3/31/16)

An Evaluation Team meeting will be held on July 29 at 9:00 AM in Conference Room 303A at SCDOT Headquarters.

Evaluation Team Meeting Agenda (PDF 31 Kb) (Posted 5/28/15)

An Evaluation Committee meeting to distribute the Statements of Qualifications will be held on June 25, 2015, at 2:00 PM in Conference Room 1 at SCDOT Headquarters.

Evaluation Team Meeting #1 Agenda (PDF 44 Kb) (Posted 6/24/15)

To view PDF files, you will need Adobe Acrobat Reader