The SCDOT deputy secretary for engineering sets engineering policy and direction, which requires compliance by the appropriate engineering divisions and all other providers of service to the Engineering Division, such as consultants and contractors. The deputy secretary for engineering issues engineering directive memorandums containing the procedures for carrying out engineering policy. Engineering directive memorandums are reviewed annually.
If you have questions about engineering directive memorandums, please call the Office of the Deputy Secretary for Engineering at (803)737-7900 or fill out the EDM help form.
Select a engineering directive memorandum category from the list below. Then select the view button. Your changes will appear in the table below.
| EDM |
Effective
Date |
Revision
Date |
Title |
| 1 | 11/21/2003 | None | Development of Department of Transportation Engineering Directives |
| 2 | 11/21/2003 | 01/01/2008 | Fiscal and Maintenance Responsibilities for Traffic Signal Installations on the State Highway System |
| 3 | 11/21/2003 | 06/04/2008 | Annual Work Zone Traffic Control Reviews |
| 4 | 11/21/2003 | 01/20/2009 | Reflective Sheeting for Signs |
| 5 | 11/21/2003 | None | Delineators on Interstates and Freeways |
| 6 | 11/21/2003 | 01/20/2009 | Changes to Stop Control |
| 7 | 11/21/2003 | 08/22/2007 | Guidelines for Scenic Byway Sign Placement |
| 8 | 11/21/2003 | 05/27/2005 | Annual Night Time Roadway Safety Inspections of Signs & Pavement Markings |
| 9 | 11/21/2003 | None | Removal of Signs from the Department's Right-of-Way |
| 10 | 11/21/2003 | 12/13/2006 | Disposal of Surplus Soil or Earth-Type Materials from Regrading High Shoulders, Cleaning Roadway Ditches, and Slopes |
| 11 | 11/21/2003 | 09/03/2008 | Procedures for Posting or Changing Weight Limits on Bridges |
| 12 | 11/21/2003 | None | Equipment Disposal |
| 13 | 11/21/2003 | 07/14/2008 | Maintenance Bridge Replacement Projects |
| 14 | 11/21/2003 | 06/18/2008 | Procedure for Reporting Road Closings/Openings and Road Conditions Due to Construction, Infrastructure Failure, or Inclement Weather |
| 15 | 12/08/2003 | 07/16/2009 | Pavement Type Selection Process |
| 16 | 11/21/2003 | 03/30/2009 | Installation of Residential Driveway Entrances by Maintenance Forces |
| 17 | 04/25/2005 | 04/29/2009 | Encroachment Permits |
| 18 | 04/30/2004 | 05/11/2007 | Procedures for the Release of Bridge Plans to Non-Department Entities |
| 19 | 11/21/2003 | 05/01/2004 | Manual on Uniform Traffic Control Devices |
| 20 | 05/16/2005 | None | FHWA/State Cooperative Agreement Covering Forest Highways |
| 21 | 02/19/2007 | 12/17/2008 | The Permanent Closing of Department Facilities |
| 22 | 07/10/2004 | None | Considerations for Bicycle Facilities |
| 23 | 06/03/2005 | 03/10/2009 | Standards for Stormwater Management and Sediment Reduction |
| 24 | 06/02/2005 | 01/16/2008 | Selection of Drainage Pipe for Use in South Carolina |
| 25 | 04/18/2005 | 04/24/2008 | Specific Signing Bid Procedures |
| 26 | 06/29/2005 | None | Dams/Water Impoundments Adjacent to Highways |
| 27 | 11/01/2005 | None | Drainage Outfalls |
| 28 | 01/09/2006 | 07/27/2009 | Road Closures for Parades, Festivals, or Other Events |
| 29 | 12/03/2006 | None | Vegetation Management on State Highways |
| 30 | 01/09/2006 | 03/11/2009 | Borrow Pit Location and Monitoring |
| 31 | 07/10/2007 | None | Procedure for Reviewing Requests for "School Bus Stop Ahead" Signs |
| 32 | 02/24/2006 | 02/17/2009 | Hourly Restrictions for Lane Closures on Interstate and Primary Routes |
| 33 | 02/26/2007 | None | SCDOT Mast Arm Standards |
| 34 | 09/12/2007 | 03/05/2009 | Value Engineering |
| 35 | 10/08/2007 | None | Emergency Procurement of Construction Services |
| 36 | 02/01/2008 | 06/04/2008 | Public Notification of Bridge Replacement Projects |
| 37 | 09/04/2007 | None | Standards for Sealing Engineering Documents |
| 38 | 04/07/2008 | None | Architect-Engineer Plan Errors and Omissions |
| 39 | 01/22/2008 | None | Environmental Training |
| 40 | 06/02/2008 | None | Acknowledgement Signs |
| 41 | 09/15/2008 | None | Removal of Roads from the State Highway System |
| 42 | 06/09/2008 | 03/23/2009 | Inspection and Repair of Guardrail, Cable Barrier, and Crash Attenuators |
| 43 | 06/19/2008 | None | Bridge Ices Before Road Warning Signs |
| 44 | 02/18/2009 | None | Procedures for Removing Closed Bridges from the State System |
| 45 | 11/10/2008 | None | Cellular Telephone Usage |
| 46 | 01/20/2009 | None | Satellite Telephone Management, Testing, and Reporting |
| 47 | 07/27/2009 | None | Local Public Agency Project Administration |
| 50 | 01/13/2009 | None | Non-Interstate Road Resurfacing Project Selection Process |
| 51 | 01/12/2009 | None | Bridge Replacement Project Selection Process |
| 52 | 01/13/2009 | None | Interstate Rehabilitation Project Selection Process |
| 54 | 01/13/2009 | None | Safety Project Selection Process |
| 56 | 01/14/2009 | None | Interstate Mainline Capacity and Interchange Project Selection Process |
| 60 | 01/14/2009 | None | COG and MPO Project Ranking Process |
| 61 | 01/14/2009 | None | Congestion Management/Air Quality (CMAQ) Project Selection Process |