Bulletins for 2015 |
2015-8 |
Right of Way Data Sheets |
11/06/2015 |
2015-7 |
Moving Item/Removal Data Sheets |
11/06/2015 |
2015-6 |
Revised Pay Item Quantity Sheets |
11/06/2015 |
2015-5 |
Revised Design Field Review Title Sheet |
08/14/2015 |
2015-4 |
General Construction Sheet |
04/01/2015 |
2015-3 |
New Pay Items & Specifications |
04/01/2015 |
2015-2 |
Pay Items Shown in Plans |
02/03/2015 |
2015-1 |
Pedestrian Ramp Construction |
03/01/2015 |
Bulletins for 2014 |
2014-7 |
Submittal Process for Letting Effective |
10/01/2014 |
2014-6 |
Dates for Assembling Information for Construction Obligations |
10/01/2014 |
2014-5 |
Labeling of Plan Sheets for R/W Revisions |
06/01/2014 |
2014-4 |
Guidelines for Placement of National Pollutant Discharge Elimination System (NPDES) Information on Construction Plans |
07/01/2014 |
2014-3 |
Revised Roadway Title Sheet for Consultant Prepared Projects |
07/01/2014 |
2014-2 |
Revised Roadway Title Sheet for Internally Prepared Projects |
07/01/2014 |
2014-1 |
Revised Plan Labels for P2S Identifiers on Plans |
06/01/2014 |
Bulletins for 2013 |
2013-7 |
Revised Roadway Title Sheet for Internally Prepared Projects |
11/01/2013 |
2013-6 |
Revised Roadway Title Sheet for Consultant Prepared Projects |
11/01/2013 |
2013-5 |
Revised Design Field Review Title Sheet |
09/01/2013 |
2013-4 |
Dates for Assembling Information for Construction Obligations |
07/22/2013 |
2013-3 |
Temporary Barrier Fence for Environmental Boundary |
03/01/2013 |
2013-2 |
Landscaping Pay Items |
06/01/2013 |
2013-1 |
Pedestrian Ramp Construction |
06/01/2013 |
Back to Top |
Bulletins for 2012 |
2012-3 |
Dates for Assembling Information for Construction Obligations |
07/23/2012 |
2012-2 |
Verification of Present Right of Way on Plans Prepared by or for the Department |
07/09/2012 |
2012-1 |
Geopak Criteria to Place Right of Way on Cross Sections |
08/01/2012 |
Back to Top |
Bulletins for 2011 |
2011-6 |
New Roadway Title Sheets for Internally Prepared Projects |
08/01/2011 |
2011-5 |
New Roadway Title Sheets for Consultant Prepared Plans |
08/01/2011 |
2011-4 |
Revised Erosion Control Data Sheet - Instructional Bulletin 2011-1 and Supplemental Technical Specification SC-M-810-2 |
10/18/2011 |
2011-3 |
Dates for Assembling Information for Construction Obligations |
07/26/2011 |
2011-2 |
Letting Procedure for Projects with Controlled Fill - Section 203 Borrow Material |
08/01/2011 |
2011-1 |
Section 810 - Seeding |
07/01/2011 |
Back to Top |
Bulletins for 2010 |
2010-1 |
Culvert Pipe Structural Design Criteria |
05/13/2010 |
Back to Top |
Bulletins for 2009 |
2009-6 |
New Pay Items and Specifications |
08/11/2009 |
2009-5 |
Storm Sewer Pipe on Cross Sections |
06/30/2009 |
2009-4 |
Design and Implementation of Alternate Pipe |
10/01/2009 |
2009-3 |
Hydraulic Design Reference Label |
06/15/2009 |
2009-2 |
Rip-Rap for Pipe End Treatments |
09/01/2009 |
2009-1 |
Section 810 - Seeding |
04/14/2009 |
Back to Top |
Bulletins for 2008 |
2008-6 |
Section 810 - Seeding |
01/12/2009 |
2008-5 |
Pipe Alternate Interim Procedure |
09/09/2008 |
2008-4 |
New Index/Layout Sheet for Projects |
09/09/2008 |
2008-3 |
Borrow Excavation/Cement Modified Subbase |
04/11/2008 |
2008-2 |
New Roadway Title Sheets for Consultant Prepared Projects |
07/08/2007 |
2008-1 |
New Roadway Title Sheets for Internally Prepared Projects |
04/11/2008 |
Back to Top |
Bulletins for 2007 |
2007-6 |
Review of Roadway Plans by Preconstruction Support |
12/20/2007 |
2007-5 |
Revised Standard Drawings |
10/02/2007 |
2007-4 |
Culvert Pipe Structural Design Criteria |
07/03/2007 |
2007-3 |
Cancel Instructional Bulletin No.2006-11 |
01/25/2007 |
2007-2 |
Implementation of Changes to Low Side Paved Shoulders in Superelevation |
01/24/2007 |
2007-1 |
Consultant Title Sheet |
01/22/2007 |
Back to Top |
Bulletins for 2006 |
2006-11 |
Stormwater Pollution Prevention Plan (SWPPP) Certification |
01/09/2006 |
2006-10 |
Erosion Control Pay Items |
08/25/2006 |
2006-9 |
Construction Plans Review |
07/31/2006 |
2006-8 |
'C' Project Field Review |
07/26/2006 |
2006-7 |
Design Field Reviews |
07/27/2006 |
2006-6 |
Preliminary Right Of Way Plans Field Review |
7/28/2006 |
2006-5 |
Calculating Detour Mileage |
04/06/200 |
2006-4 |
Revised Standard Drawings |
02/27/2006 |
2006-3 |
Right of Way Data Sheets |
02/03/2006 |
2006-2 |
Plan Preparation Guide Chapter 1, Section 2 Title Sheets |
01/25/2006 |
2006-1 |
Hydrology Data (Revised) |
01/06/2006 |
Back to Top |
Bulletins for 2005 |
2005-9 |
Design Field Review Options for Bridge Projects |
09/08/2005 |
2005-8 |
Road Design Deliverables for Hydraulic Engineering |
09/01/2005 |
2005-7 |
Recording Quitclaimed Property on Plans |
08/29/2005 |
2005-6 |
Design Field Review Title Sheet |
08/05/2005 |
2005-5 |
Project File Number |
07/15/2005 |
2005-4 |
Roadway Flowchart for Bridge Replacement Projects (Revised) |
07/12/2005 |
2005-3 |
Utility Information in Plans |
06/11/2005 |
2005-2 |
Stabilized Construction Entrance |
06/06/2005 |
2005-1 |
Pay Items Not in Plans |
04/27/2005 |
Back to Top |
Bulletins for 2004 |
2004-15 |
Roadway Flowchart for Bridge Replacement Projects |
04/30/2004 |
2004-14 |
Fine Grading (Revised) Superseded by 2007 Standard Specifications Book & Supplemental Specification dated January 4th, 2012 |
04/05/2004 |
2004-13 |
Rolled Erosion Control Production (Revised) |
07/01/2004 |
2004-12 |
Pavement Under Guardrail for Bridge Replacement Projects |
03/18/2004 |
2004-11 |
Quality Control by Contractor |
03/04/2004 |
2004-10 |
Borrow Excavation/Cement Modified Subbase |
01/01/2004 |
2004-9 |
Design Field Review Plans to Project Web |
03/08/2004 |
2004-8 |
Sediment Control Structure and Basin |
03/10/2004 |
2004-7 |
QuadGuard Back-up Systems |
03/05/2004 |
2004-6 |
Detectable Warnings Superseded by Instructional Bulletin 2013-1, SCDOT Standard Drawings, and SCDOT ADA Transition Plan |
05/01/2004 |
2004-5 |
Erosion Control Data Sheet |
02/25/2004 |
2004-4 |
Fine Grading |
03/02/2004 |
2004-3 |
Quality Control by Contractor |
03/01/2004 |
2004-2 |
Quality Assurance of Design Field Review Plans |
02/02/2004 |
2004-1 |
Road Design Production Criteria for "C" Projects (revised) |
01/01/2004 |
Back to Top |
Bulletins for 2003 |
2003-11 |
Longitudinal Gradient (LG%) - Superelevation Development HDM Chapter 11.3 |
12/31/2003 |
2003-10 |
Sprigging & Sodding |
09/02/2003 |
2003-9 |
Hydrology Data - HDM Section 35.5 |
09/12/2003 |
2003-8 |
Design Reference Label |
04/21/2003 |
2003-7 |
Road Design Production Criteria for "C" Projects |
06/11/2003 |
2003-6 |
General Construction Note |
07/01/2003 |
2003-5 |
Drainage for Bridge Ends |
04/02/2003 |
2003-4 |
Baled Straw / Sediment Tubes / Curb Inlet Filters |
04/10/2003 |
2003-3 |
Quantities Shown on General Construction Note |
03/17/2003 |
2003-2 |
Design Field Review Title sheet |
02/03/2003 |
Back to Top |
Bulletins for 2002 |
2002-7 |
Guidelines for Adjusting Right of Way with Regard to the National Pollutant Discharge Elimination System (NPDES) Supersedes IB 2001-12 |
01/02/2003 |
2002-6 |
Bridge Construction Access |
02/03/2003 |
2002-5 |
Design Field Review Title Sheet |
10/01/2002 |
2002-4 |
Drainage for Bridge Ends |
09/03/2002 |
2002-3 |
Drainage Layout for Storm Sewer Design |
07/03/2002 |
2002-2 |
Revised Standard Drawings |
07/15/2002 |
2002-1 |
Trench Drain Applications |
05/03/2002 |
Back to Top |
Bulletins for 2001 |
2001-21 |
Electronic Files for As-Built Plans |
10/22/2001 |
2001-20 |
Highway Design vs. Local Tree Ordinances |
10/11/2001 |
2001-19 |
Plan Size |
10/19/2001 |
2001-18 |
Bid Items for Construction Stakes, Lines/Grades, As-Built Construction Plans on Bridge Replacement Projects |
10/01/2001 |
2001-17 |
Pavement Identification on Typical Section Sheets |
08/20/2001 |
2001-16 |
Railroad Right of Way |
08/28/2001 |
2001-15 |
Designation of Concrete Classes |
08/15/2001 |
2001-14 |
Revisions to Plans |
07/06/2001 |
2001-13 |
Request for Traffic Data and Pavement Designs |
07/02/2001 |
2001-12 |
NPDES Line |
06/19/2001 |
2001-11 |
Property Identification in Plans |
05/28/2001 |
2001-10 |
Design Plans Field Review Title Sheet See 1999-5, 2002-5, 2003-2 |
06/21/2001 |
2001-8 |
Pavement Design Coordination |
05/21/2001 |
2001-7 |
Moving Items / Demolition Sheet |
05/03/2001 |
2001-6 |
Sidewalks at Intersections |
05/03/2001 |
2001-5 |
Construction (Work) Zone Portable Terminal Impact Attenuators |
06/01/2001 |
2001-4 |
Rip Rap |
04/10/2001 |
2001-3 |
Changes to Construction Plans |
02/01/2001 |
2001-2 |
Road Plan Production Criteria for Bridge Replacement Projects |
02/19/2001 |
2001-1 |
Guidelines for Hot Mix Asphalt Selection |
01/02/2001 |
Back to Top |
Bulletins for 2000 |
2000-7 |
CADD Title Sheets for Plans |
09/15/2000 |
2000-6 |
Width of Concrete & Earth Sidewalk |
08/17/2000 |
2000-5 |
Rip Rap |
08/14/2000 |
2000-4 |
Removal & Disposal of Asphalt Pavement (Metric) See 1996-16 |
07/01/2000 |
2000-3 |
Group Designation for Secondary Roads |
06/20/2000 |
2000-2 |
Coquina Shell Base Course See 1998-2 |
05/10/2000 |
2000-1 |
Drainage System Layout for Storm Sewer Design See 2002-3 |
04/04/2000 |
Back to Top |
Bulletins for 1999 |
1999-11 |
Curb Profile |
11/22/1999 |
1999-10 |
Paving Under Guardrail (Updated) See 1995-17 |
06/23/1999 |
1999-9 |
Bridge End Curb and Flume (Updated) See 1996-12 |
06/24/1999 |
1999-8 |
Guidelines for Hot Asphalt Selection See 1997-3, 1999-6 |
05/03/1999 |
1999-7 |
Alternate Base Course |
03/01/1999 |
1999-6 |
Guidelines for Hot Mix Asphalt Selection See 1997-3, 1999-8 |
02/24/1999 |
1999-5 |
Field Review Plans See 2001-10, 2002-5, 2003-2 |
03/01/1999 |
1999-4 |
Pavement Markings on Bridge Projects |
02/26/1999 |
1999-3 |
New Drainage/NPDES CADD Procedures for Consultants See 1994-5 |
01/17/1999 |
1999-2 |
Superelevation |
02/18/1999 |
1999-1 |
Design Speed at T-Intersections |
01/18/1999 |
Back to Top |
Bulletins for 1998 |
1998-13 |
Water Flow Detail at Crossings |
11/16/1998 |
1998-12 |
PS&E (Field Review) Plans Title Sheet |
09/15/1998 |
1998-11 |
Revised Title Sheet |
09/09/1998 |
1998-10 |
Changes to Drainage Designs |
09/04/1998 |
1998-9 |
Road Plans Revisions (Updated) See 1998-04 |
09/16/1998 |
1998-8 |
Bridge End Curb & Flume (Updated) See 1996-12 |
08/25/1998 |
1998-7 |
Guardrail End Treatment See 1995-4 |
08/25/1998 |
1998-6 |
Estimates for "C" Projects |
05/22/1998 |
1998-5 |
Construction Lines & Grades |
06/10/1998 |
1998-4 |
Road Plan Revisions See 1998-9 |
05/15/1998 |
1998-3 |
Additional Alternate Pipe Note |
04/08/1998 |
1998-2 |
Coquina Shell Base Course See 2000-2 |
10/01/1997 |
1998-1 |
Borrow Excavation & Permanent Vegetation on Resurfacing Projects |
04/14/1998 |
Back to Top |
Bulletins for 1997 |
1997-12 |
Coordination of Road Design with Traffic Engineering |
12/14/1997 |
1997-11 |
Reference Sheet Control Points & New Note for Plan Sheets |
11/25/1997 |
1997-10 |
Relocated Centerlines |
11/26/1997 |
1997-9 |
Erosion Control Blanket |
09/22/2007 |
1997-8 |
Presentation of Right of Way Verification Information |
11/07-1997 |
1997-7 |
Preliminary Prints to Right of Way |
08/06/1997 |
1997-6 |
Right of Way Data Sheet Revision |
07/01/1997 |
1997-5 |
Documentation of Activities in PPMS |
06/03/1997 |
1997-4 |
Design Information from Preliminary Design |
04/22/1997 |
1997-3 |
Guidelines for Hot Mix Asphalt Selection See 1999-6, 1999-8 |
01/20/1997 |
1997-2 |
Reclaiming Existing Roadway "Notes" See 1996-16 |
01/24/1997 |
1997-1 |
New "C" Project Title Sheets |
03/25/1997 |
Back to Top |
Bulletins for 1996 |
1996-16 |
Reclaiming Existing Roadway Notes See 1996-14, 1997-2, 2000-4 |
12-16-1996 |
1996-15 |
Revised Secondary "C" Project Review Procedures & Title Sheet |
11/04/1996 |
1996-14 |
Reclaiming Existing Roadway Notes See 1996-16 |
09/10/1996 |
1996-13 |
Recommended Asphalt Surface Mixes |
08/15/1996 |
1996-12 |
Bridge End Curb & Flume See 1995-14, 1998-8, 1999-9 |
11/01/1996 |
1996-11 |
Quantity Revisions to Plans Let to Cotract & Awarded |
07/29/1996 |
1996-10 |
Railroad Encroachment by Highway Right of Way |
07/22/1996 |
1996-9 |
Required Information for Secondary Road P.S.&E. Prints |
07/30/1996 |
1996-8 |
Alternate Pipe Notes |
05/30/1996 |
1996-7 |
New Secondary "C" Project Review Procedures See 1996-15 |
05/28/1996 |
1996-5 |
CADD Files for Additional Surveys |
04/01/1996 |
1996-4 |
Property Data on Bridge Replacement Projects See 1995-18 |
03/11/1996 |
1996-3 |
Benchmark Notations |
02/15/1996 |
1996-2 |
Guidelines to Determine Right of Way with Regard to the NPDES See 1995-20 |
02/12/1996 |
1996-1 |
Moving Item Sheet |
01/15/1996 |
Back to Top |
Bulletins for 1995 |
1995-20 |
Guidelines to Determine Right of Way with Regard to NPDES See 1996-2 |
|
1995-19 |
Paving Under Guardrail See 1995-17 |
12-01-1995 |
1995-18 |
Property Data on Bridge Replacement Projects See 1996-4 |
11-29-1995 |
1995-17 |
Paving Under Guardrail See 1995-19, 1999-10 |
10-11-1995 |
1995-16 |
Typical Sections in Developed Areas See 1996-6 |
11/03/1995 |
1995-15 |
Selection of Drainage Pipe for Use in South Carolina Highways |
09/08/1995 |
1995-14 |
1. Curb Ramps 2. Bridge End Bituminous Curb and Flume 3. Alternate Pipe Bid and Beveled End Sections See 1996-12 |
10/17/1995 |
1995-13 |
1. Station on Property Lines 2. Culvert Foundation Sketches 3. Treatment of Paved Backlip on the High Side of Superelevation When Using a Valley Gutter Section |
11/01/1995 |
1995-12 |
Map of Recommended Geotextile for Erosion Control |
09/20/1995 |
1995-11 |
Degress of Accuracy for Estimated Quantities for Metric Projects |
09/26/1995 |
1995-10 |
Quality Control/Quality Assurance for "C" Projects |
08/25/1995 |
1995-9 |
Selecting Geotextile for Erosion Control Under Rip Rap |
08/15/1995 |
1995-8 |
Mowing |
09/15/1995 |
1995-7 |
Preliminary Plans to Environmental Section |
07/26/1995 |
1995-6 |
Public Hearing Plans |
08/03/1995 |
1995-5 |
Reconciling Project Charges Made by Road Design |
07/26/1995 |
1995-4 |
Guardrail End Treatment (MELT) See 1998-7 |
04/07/1995 |
1995-1 |
Selection of Drainage Pipe for Use in South Carolina Highways |
01/03/1995 |
Back to Top |
Bulletins for 1994 |
1994-17 |
Critical Offset Steel Beam Guardrail |
10/20/1994 |
1994-16 |
Polyethylene Pipe |
08/17/1994 |
1994-15 |
Document Fees |
08/15/1994 |
1994-14 |
Permanent Construction Signs See 1994-12 |
|
1994-13 |
PS&E Title Sheet |
07/01/1994 |
1994-12 |
Permanent Construction Signs See 1994-14 |
06/24/1994 |
1994-11 |
Instructions for Sediment/Erosion Control Plans for SC Highway Construction See 2003-4 |
05/19/1994 |
1994-10 |
Full Depth Asphalt Pavement Patching |
04/23/1994 |
1994-9 |
Underground Storage Tanks |
04/21/1994 |
1994-8 |
Revised Title & New "General Construction Note" Sheets |
05/12/1994 |
1994-7 |
Prime Coat |
04/08/1994 |
1994-6 |
Underground Storage Tanks See 1994-9 |
04/20/1994 |
1994-5 |
Drainage Design/NPDES CADD Procedures for Consultants See 1999-3 |
04/01/1994 |
1994-4 |
Right of Way Section Access of Road Design Secondary Projects CADD Files |
03/17/1994 |
1994-2 |
Right of Way Plans |
04/11/1994 |
1994-1 |
Recycled Asphalt Concrete Mixtures |
12/08/1993 |
Back to Top |