Emergency Bridge Package 6

The Project consists of all work necessary, at three separate locations, to remove the existing bridges and to construct new bridges, including the associated roadway and drainage work necessary to tie the new approaches to the existing roadways. As the result of flooding, the existing structures were damaged beyond repair. The three locations are described as follows: SC 48 (Bluff Road) over Back Swamp, SC 48 over Cedar Creek, and SC 48 over Dry Branch in Richland County. At all locations, the necessary work includes repairing damaged or deficient roadway embankments within the roadway approach limits of each bridge.


Request for Proposals

Request for Proposals (Final) (05/23/16)
Request for Proposals (Industry Review) (05/13/16)


Attachment B

Enviromental

  1. Cultural Survey Draft (05/13/16)
  2. CE-B (05/13/16)

Roadway

  1. Drawing 805-710 SP (05/13/16)

Attachment C

Environmental

  1. Cultural Shape Files (05/13/16)

Geotechnical

  1. SC 48 Geotech - PGSDR (05/13/16)
  2. SC 48 Field Testing Data (05/13/16)

Roadway

  1. SC 48 Old Plans (05/03/16)
  2. Survey (05/03/16)

Structures

  1. Existing Bridge Plans (05/03/16)
  2. SI&A Reports (05/03/16)
  3. Bridge Inspection Reports (05/23/16)

Traffic

  1. SC 48 Detour (05/13/16)

Utilities

  1. Utility Contacts (P05/03/16)

Evaluation Team Meetings

An Evaluation Team meeting will be held on May 26, 2016 at 9:00 AM at SCDOT Headquarters in Room 421.
Evaluation Team Meeting Agenda - Proposal Distribution (05/23/16)

An Evaluation Team meeting will be held on May 26, 2016 at 1:00 PM at SCDOT Headquarters in Room 421.
Evaluation Team Meeting Agenda - Proposal Evaluation (05/23/16)

Notice to Parties Interested in Providing Design Build Services

Qualifications and/or proposals from any contracting entity must utilize the ProjectWise electronic proposal submission system. The following information describes the process that teams should follow to access the SCDOT ProjectWise environment for proposal submissions and their respective project data using the new system. Please use this ProjectWise Account Setup & Requirements link to set up accounts.